The Ohio Canal Interceptor Tunnel (OCIT) broke ground on November 6, 2015. This is the largest project under the Akron Waterways Renewed! program. The tunnel will be 27 feet in diameter, span a distance of 6,240 feet, and will be able to hold 25 million gallons of storm water and sewage. 

In August the contractor will continue working on completing the TDS Overflow Slab, begin constructing the TDS interior walls, resume backfilling over the LCI Connector pipe and around the LCI structures. During this activity the Contractor will relocate the access ramp for the TDS to allow construction of the LCI Junction Chamber and the Overflow Culvert.

Installation of the generator and other large equipment inside the Control Building, then install trusses.

Continue backfilling at the North Wall of the TDS in preparation for the construction of the TDS Overflow Transition and the Access Drive retaining walls and continue demobilizing miscellaneous tunneling equipment from the OCIT-1 lay-down yard.

Little Cuyahoga Interceptor (LCI) Connection Structures

The Contractor is installing the Temporary Earth Retaining System (TERS) and started excavating for the Little Cuyahoga Interceptor (LCI) connection structures (Meter Vault, Valve Vault, Junction Chamber and Drop Chamber).

OCIT-1 Consolidation Sewer

Continued excavation for installation of 72” Hobas piping from the retrieval pit on the north side of the railroad to MH #11, begin installing MH #5 and resume installation of the Rack 20 Sewer, along with associated MH #8 and MH # 9.

 

**ROSIE UPDATE***

Join us HERE to see Rosie's Progress!!

Live Webcam

August 2019 Photos

July 2019 Photos

June 2019 Photos

May 2019 Photos

April 2019 Photos

March 2019 Photos

February 2019 Photos

December 2018 Photos

November 2018 Photos

October 2018 Photos

September 2018 Photos

August 2018 Photos

July 2018 Photos

June 2018 Photos

May 2018 Photos

April 2018 Photos

March 2018 Photos

February 2018 Photos

January 2018 Photos

December 2017 Photos

Novmber 2017 Photos 

October 2017 Photos

September 2017 Photos

August 2017 Photos

July 2017 Photos

June 2017 Photos

May 2017 Photos

March 2017 Photos

January 2017 Tunnel Boring Machine Photos

January 2017 Photos

December 2016 Photos

November 2016 Photos

October 2016 Photos

September 2016 Photos

August 2016 Photos

July 2016 Photos

June 2016 Photos

May 2016 Photos

April 2016 Photos

March 2016 Photos

February 2016 Photos

January 2016 Photos

Back to Construction Listing