OCIT Preliminary Engineering Report

File 1 of 4

  • Executive Summary
  • 1: Introduction

File 2 of 4

  • 2: Analysis

File 3 of 4

  • 2: Analysis (Continued)

File 4 of 4

  • 3: Design Criteria
  • 4: Project Costs
  • 5: Recommended Future Analyses