Watch along on November 12, 2025 at 12 P.M. with the Akron Waterways Renewed! team as Elaine, the tunnel boring machine for the Northside Project, breaks through into her final destination shaft.
oxblue.com/pro/videoRedirect.php?videoCamID=0e6b9d144e514140ae416691d1583215